Past Events
Technical Visit – Qiaocheng East Road Northern Extern Passage Project
Introduction
The Qiaocheng East Road Northern Extension Passage Project (Section 2, Work Zone 3) is located on the northern side of Tanglang Mountain, between Liuxian Avenue and Xueyuan Avenue. It mainly consists of the cut-and-cover tunnel section, ramp system, and associated ancillary works.
The tunnel section features a compact layout, continuously varying cross-sections, and complex structural design. It includes an approximately 100-meter-long management building that occupies 2 to 3 underground levels. The retaining structure adopts a differentiated support system: the mainline excavation pit uses a combination of diaphragm walls, concrete struts, steel lattice columns, and temporary steel strut replacement; the branch line excavation pit employs a composite scheme consisting of bored piles, jet grouting piles, steel sheet piles, and steel struts.
Additionally, the project includes comprehensive supporting systems such as traffic diversion, water supply and drainage, power and telecommunications, lighting and monitoring, gas pipelines, and other utilities, ensuring coordinated and orderly functioning during both construction and operation.





